Tavşanlı Gold-Silver Mine

Tavşanlı Gold-Silver Mine

Tavsanli Gold and Silver Mine plant installation works within the 717 hectare EIA area identified within the scope of the Zenit Madencilik project. Based on the ore geology and metallurgy, heap leaching has been selected as the process method for the project. Preparation of analysis models, structural design reports, 3d models, connection details and drawings of 7 belt conveyors, one of which is 300 m long.

  • Date :

    2026
  • Employer :

    Ala Grup
  • Scope :

    Engineering and Design Services of Conveyors
  • Location :

    Kütahya, TURKİYE